Up Photos » Meaban » Construction of Méaban #1 - 2/2 Prev Next Slideshow

 Previous image  Next image  Index page
Mea1 Const B 01
Mea1 Const B 02
Mea1 Const B 03
Mea1 Const B 04
Mea1 Const B 05
Mea1 Const B 06
Mea1 Const B 07
  Mea1 Const B 08.JPG - The box is filled up with plaster. Then the polystryrene is removed.  
Mea1 Const B 09
Mea1 Const B 10
Mea1 Const B 11
Mea1 Const B 12
Mea1 Const B 13
Mea1 Const B 14
Mea1 Const B 15

 8 | The box is filled up with plaster. Then the polystryrene is removed.

Home Francois Vivier Naval Architect | Help